Street Rehabilitation & Construction Photos
![Installation of curb barriers with construction barrels](https://ehq-production-us-california.imgix.net/f22a0b2b1969a5a9578bae174df81db81a3726d0/original/1672849998/5149948e200af253ec745b60e81cbfa3_15_12_22_11TH_Safety_2.jpg?auto=compress)
Installation of curb barriers with construction barrels
A cross section of 11th street, east of Studewood, indicating three lanes with a two-way left turn lane in the middle and concrete curb barriers on both sides. The concrete curb barriers are designating a future bike lane. The construction barrels before/after each curb barrier are temporary during construction.